|
Extra test transmission on
Tuesday 10th January
The transmission was successful. Reports from Italy indicated good
audibility. SAQ was detected by the
WWLL receivers in Boston
and Nanjing.
The problem with SAQ on
Christmas Eve
The reason for the trouble with SAQ on Chrismas Eve was most probably a
damaged fuse in the excitation circuit for the 500 V DC generator. The
fuse was not completely blown but measured a very high resistance (150
ohm). When we lost the excitation current to the DC generator, we also
lost the control current to the choke coils in the conductors to the main
motor, and thereby the speed control of the alternator was lost.
It was confusing that the problem occured exactly when we connected the
running alternator to the antenna. We were actually on air a few seconds
with decreasing frequency until the antenna was disconnected by the
protection circuit in the speed control.
Listeners' reports
Test transmission on 10th January,
click here....
Unofficial
transmissions
Unofficial transmissions may take place, due to maintenance, training or
local events. Reports from unofficial transmissions are normally not
confirmed by QSL cards.
Start of
alternator without transmission
In summertime, the Alexander Society shows the alternator on Tuesday
evenings, combined with a start of the alternator. On these events, there
is no transmission from SAQ,

Photo: Mats Gunnarsson
SM6NM Lars Kålland
at the key
|